Our flagship large-bore unit: 2 MW of prime power from natural gas or associated gas, for heavy industry, utility-scale distributed generation and multi-unit power plants.
The AP-2000NG is built on a large-bore engine platform with high-voltage alternator options, aimed at sites where every square meter of plant space and every connection point counts. A single 2 MW container replaces several smaller units; where redundancy or growth is the priority, multiple AP-2000NG units parallel on one control system. Performance figures, heat balance and gas consumption are stated project-specific in our offer — with guarantee values — once your gas analysis and site conditions are on the table.
| Rated power (prime) | 2,000 kW / 2,500 kVA |
|---|---|
| Electrical efficiency | Stated per project with guarantee value |
| Frequency | 50 Hz or 60 Hz |
| Output voltage | 6.3 kV / 10.5 kV |
| Fuel | Natural gas, associated petroleum gas |
| Configurations | Container / open skid / paralleling plant |
| Paralleling | Up to 32 units |
| Documentation | Performance guarantee, FAT report, heat balance sheet |
40 ft container Open skid High voltage 6.3 / 10.5 kV Paralleling plant Waste heat recovery
Yes — once we receive your gas analysis and site conditions (altitude, ambient temperature, cooling), our offer states electrical efficiency and specific gas consumption with guarantee values, verified at the factory acceptance test.
Reciprocating gas engines are available on normal industrial lead times — a fraction of what heavy gas turbines currently require. Contact us for a current commitment date.